Environmental Walkway Piling | Princeton Junction, NJ
Situation
This commercial client needed to connect two properties with a walking path through an environmentally sensitive area. The objective was to have equipment and pile installation the least intrusive as possible.
Strategy and Action
A 7,000 lbs excavator was used to gently install the 76 walkway piles (RS 278.20), with an 8″/10″/12″ helical configuration.